Rogunskaya HPP is a hydroelectric power plant under construction in Tajikistan situated on the upper level of the Vakhsh cascade. According to the project, it is a dam-type hydropower plant with a high-rise (335 m) rock embankment dam. If the project is completed, the dam will be the highest in the world. Planned capacity of Rpgunskaya HPP is 3,600 MW, average annual output is 17.1 billion kWh

Rogunskaya HPP
date

started at 2017

finished till present days

Location

Tajikistan

vakhsh cascade

WHAT IS DONE

Supply of technological appliances and tools for installation and reconstruction of hydrogenerators, pre-assembly of the thrust of the hydrogenerator, preliminary distillation of prisms on the stator of the hydrogenerator, assembly of large hydrogenerator units

features

Year of construction

1976-1994

Number of hydraulic units

6

Impeller diameter

8.5 m

Estimated pressure

40 m

The installed capacity of hydroelectric

3600 Mw

Type of turbine

radial-axial

Generator

СВ-1636/200-80 UHL

Checkout our projects

Vartsikhe HPP

Hydroelectric complex in the river Rioni

Baypazinskaya HPP

Hydroelectric power plant on the Vakhsh River

Delivery of the equipment

SEP Electrotyazhmash

Designing & Engineering

OJSC Power Machines

Industrial construction

Andritz Hydro GmbH

Installation work

PJSC Dnipro-SGEM

Manufacturer

PJSC Turboatom

STM Power a.s.

Copyright 2018. SGEM Group S.R.O. All rights reserved.

Scroll Up